Prikazna Kalina Kindergarden N. 80

    1. Register Number: 7

    2. Address: Residential Complex “Druzhba” 1, 40 “Ivan Arabadzhiyata” Str.; “Peperuda” United Child Care Center N. 36, “Iskar” District


    3. Coordinates:

      42.680471, 23.291670


    4. Artist/Architect: Dimitar Valchev (“Muti”)


    5. Type of Site: Monumental Decoration


    6. Name: “Prikazna Kalina” Kindergarden N. 80


    7. Other Names for the Monument: 


    8. Technique: Sgraffito

    9. Materials Used: 


    10. Dating: 1986


    11. Monument Ownership: Public Property


    12. Document Types:


    13. Cadastral Map Identifier:


    14. Regulation Plan Number :


    15. Affiliation to Other Cultural Monuments or Assemblages:


    16. Dimensions of the Monument (measurements): 


    17. Description – Analysis of the Type, Style & Iconography :
      The sgraffito is on the facade facing the street and was implemented using five layers of plaster, applied one over the other, in black, pink, two shades of ochre, and white, with traces of green and red surface colouring in some areas. There is no signature or date on the work.


    18. Signature/Artist’s Initials: 


    19. Condition:
      Overall, the sgraffito is in a stable condition. However, the black plaster layer has degraded in certain areas and remains of its colour have been washed onto the white facade. The building has been renovated and the sgraffito is surrounded by insulation panels that rise 10 cm above the work. It has been retouched with white paint but there are visible drips in several spots.


    20. Conservation / Restoration: No


    21. Preservation Regimes according to Bulgaria’s Cultural Heritage Act:
      In order to better present this work to the public, it is necessary to: provide for its regular maintenance and security; install lights for illumination; and add a plaque with the artist, title and year.


    22. Plans and Documentation Relating to Implementation


    23. Connection with the Environment: 


    24. Primary Function of the Building:


    25. Current Function of the Building:


    26. Access: 


    27. Observation Access: 


    28. Correspondence Between Initial Project Plan & Implementation:


    29. Comments/Other: