Tarnovo Literary School

    1. Register Number: 5

    2. Address: “Velchova Zavera” Square, Veliko Tarnovo 5000


    3. Coordinates:

      43.082950, 25.640867


    4. Artist/Architect: Prof. Nikola Hadjitanev


    5. Type of Site: Monumental decoration


    6. Name: “Tarnovo Literary School”


    7. Other Names for the Monument: 


    8. Technique: Sgraffito

    9. Materials Used: 


    10. Dating: 1974


    11. Monument Ownership: 


    12. Document Types:


    13. Cadastral Map Identifier:


    14. Regulation Plan Number :


    15. Affiliation to Other Cultural Monuments or Assemblages:


    16. Dimensions of the Monument (measurements): 


    17. Description – Analysis of the Type, Style & Iconography :
      The sgraffito adorning the dead wall of a building adjacent to the entrance of the Yantra Grand Hotel depicts the “Tarnovo Literary School.” The figural composition employs two colors—dark grey-black and ocher—applied in two layers from dark to light. The shapes are rendered in a graphically plastic manner with precise execution. Halftones are intricately worked out through hatching and scratching techniques. Additionally, small white pebbles are incorporated into the gray-blackish plaster layer, enhancing the texture of the artwork.


    18. Signature/Artist’s Initials: 


    19. Condition:
      The sgraffito is in a largely stable condition, except for the area directly beneath the roof where the plaster layers have become detached.


    20. Conservation / Restoration: A restoration of the work has been planned.


    21. Preservation Regimes according to Bulgaria’s Cultural Heritage Act:
      In order to preserve this work, it is necessary to: renovate the roof, address the leakage, and reconstruct the area that was damaged. In order to better present this work to the public, it is necessary to: provide for its regular maintanance and security; install lights for illumination; and add a plaque with the artist, title and year.


    22. Plans and Documentation Relating to Implementation


    23. Connection with the Environment: Macro – Favourable


    24. Primary Function of the Building: 


    25. Current Function of the Building: 


    26. Access: Public


    27. Observation Access: Unlimited


    28. Correspondence Between Initial Project Plan & Implementation:


    29. Comments/Other: