Sgraffito, “Vasil Levski” High School
-
- Register Number: 9
-
Address: 3 “Polkovnik Georgi Yankov” Str., Residential Complex “Mladost” 1, “Vasil Levski” High School, “Mladost” District
-
Coordinates:
-
Artist/Architect:
-
Type of Site: Monumental Decoration
-
Name: Sgraffito, “V. Levski” High School
-
Other Names for the Monument:
- Technique: Sgraffito
-
Materials Used: Plaster
-
Dating: 1970s-1980s
-
Monument Ownership: Public Property
-
Document Types:
-
Cadastral Map Identifier:
-
Regulation Plan Number :
-
Affiliation to Other Cultural Monuments or Assemblages:
-
Dimensions of the Monument (measurements): 80 sq. m
-
Description – Analysis of the Type, Style & Iconography :
Sgraffito on the facade of “Vasil Levski” High School depicting various scenes from Bulgarian history. The sgraffito is composed of two layers: the initial layer has a burnt umber colour with a distinctly coarse texture, while the upper layer exhibits a meticulously applied beige-white color with a fine surface. The work was created in 3-4 stages with a clear division of the giornata, indicated by the appearance of horizontal lines across the work.
-
Signature/Artist’s Initials:
-
Condition:
The sgraffito is in a relatively good state of preservation. However, the upper layer is partially damaged and there is some layer seperation in the lower half of the work. A security camera, installed on the lower left corner of the sgraffito, has not caused structural damage but impacts the overall apperance of the work. The newly-applied white paint surrounding the sgraffito is inappropriate. -
Conservation / Restoration:
-
Preservation Regimes according to Bulgaria’s Cultural Heritage Act:
In order to better preserve the work, it is important to: reinforce and stabalize the plaster layers, and reconstruct the missing parts. In order to better present this work to the public, it is necessary to: provide for its regular maintenance and security; install lights for illumination; change the paint surrounding the artwork to a more appropriate colour, and add a plaque with the artist, title, and year.
-
Plans and Documentation Relating to Implementation:
-
Connection with the Environment:
-
Primary Function of the Building:
-
Current Function of the Building:
-
Access:
-
Observation Access:
-
Correspondence Between Initial Project Plan & Implementation:
- Comments/Other: