Saints Cyril and Methodius

    1. Register Number: 11

    2. Address: “Bacho Kiro” Primary School, 20 “Filip Totio” St., Veliko Tarnovo 5000


    3. Coordinates:

      43.076165, 25.615640


    4. Artist/Architect: Ass. Prof. Alexander Terziev, Dimo Zaimov


    5. Type of Site: Monumental decoration


    6. Name: “The science is a sun”


    7. Other Names for the Monument: 


    8. Technique: Sgraffito

    9. Materials Used: 


    10. Dating: 1978


    11. Monument Ownership: 


    12. Document Types:


    13. Cadastral Map Identifier:


    14. Regulation Plan Number :


    15. Affiliation to Other Cultural Monuments or Assemblages:


    16. Dimensions of the Monument (measurements): 


    17. Description – Analysis of the Type, Style & Iconography :
      The mosaic, located on the entire western facade of the “Bacho Kiro” Primary School, is made of natural stone in eight colours (white, grey, light grey-green, ocher, green, brown, light umber and red) arranged and mounted on panels. The connections between the panels are clearly visible, with tesserae in the process of detaching from the base.


    18. Signature/Artist’s Initials: 


    19. Condition:
      The mosaic is in an unstable structural condition due to movement in the connecting areas of the panels, poor adhesion to the foundation, and water damage. These issues have led to an ongoing process of tesserae separation, resulting in a significant accumulation on the ground. A metal molding and anchors are visible in the lower part of the work, likely serving as panel attachments, and there is a drainage pipe fixed onto the mosaic. A portion of the mosaic in the upper right corner is black from water damage.


    20. Conservation / Restoration: 


    21. Preservation Regimes according to Bulgaria’s Cultural Heritage Act:
      In order to preserve this work, it is necessary to: stabilize and strengthen the mosaic elements; repair the joints; and fill the gaps. In order to better present this work to the public, it is necessary to: provide for its regular maintanance and security; install lights for illumination; and add a plaque with the artist, title and year.


    22. Plans and Documentation Relating to Implementation


    23. Connection with the Environment: Macro – Favourable


    24. Primary Function of the Building: 


    25. Current Function of the Building: School


    26. Access: Public


    27. Observation Access: Unlimited


    28. Correspondence Between Initial Project Plan & Implementation:


    29. Comments/Other: